Latest Projects

Earthworks

2019 - Longlands Retirement Village Matamata

Earthworks including 80,000M3 Cut to Fill. Largest Triton stormwater retention pond in the southern hemisphere using the Triton system.

2019 - Titanium South Precinct, Hamilton Airport

Earthworks including 35,000M3 topsoil strip, 70,000M3 cut to fill, 50,000M3 cut to waste.

2017 - Titanium Park West Precinct, Hamilton Airport

Earthworks including 30,000M3 topsoil strip, 120,000M3 cut to fill. Due to time constraints multiple shifts worked 24-hours around the clock.
Latest Projects

Earthworks with Retaining Walls

2019 - WDC - Settlers Track Slip Repairs

Involved slip repair works and construction of new timber post retaining walls, along the settler’s track walking track which runs aside the Waikato river.

2018 - Dixon Heights Residential Subdivision Development Stage 1

Involved construction of timber SED retaining wall structures, with deep footings of up to 4.5m.

2018 - WDHB - Onelink

Involved construction of an MSE Duramesh reinforced retaining wall 120m long, with 3m deep subgrade excavation. Challenging ground conditions due to soft subgrade and large volumes of ground water.
Latest Projects

Civil Site Works

2016 - Construct/ Tokoroa High School

Siteworks for a new Gym. Including 3,000M2 building pad excavated to 1.8m depth, extensive ground improvement to meet category 3 classification. New basketball courts on old gym building site.

2018 - Foster Construction/ Vizy Board

Siteworks for 38,000M2 Vizy Board building including removal/ trimming of trees, 13,000M3 cut to waste, importation of sand and preparation of building pad, stormwater drainage, swales and concrete carpark.

2018 - Foster Construction/ OneLink/ WDHB

Construction of a new car park extension, including earthworks, retaining walls, stormwater system installation, kerb & channel, pavement construction.
Latest Projects

3-Waters Infrastructure

2020 - Longlands Retirement Village - Pump Station

3-Waters Infrastructure for 220 Lot retirement village, included Supply and Installation of a 7-meter deep sewer rising main pump station within the Longlands retirement village development.

2019 - 2020 - MPDC - Morrinsville Watermain Replacements

Upgrade and renewal of the Morrinsville waterlines. Various size PE pipe installation including DN 63 rider main, DN 180 principal main across ten different sites.

2019 - Fulton Hogan - Cobham Drive/Wairere Drive Interchange

Stormwater installation (as Sub-Contractor to Fulton Hogan) on the Cobham Dr/Wairere Dr Interchange , Including deep excavations and 50+ manholes up to DN 2550 and 3km of stormwater pipes up to DN 900.
1 2 3 4 6
Latest Projects

Process

2019 - Naylor Love/ WDC/ Cambridge Pool Project

Extensive water reticulation within a new community facility, including some 13km of desludge, backwash and various pipework.

2019 - Waikato DC - Step Screen Installation

Upgrade of step screen whilst the client was operational under very tight time frames to ensure ongoing operations are unaffected.

2019 - 2020 - WBOP - Katikati WWTP Inlet Screen Upgrade

Upgrade and installation of a new step screen, modifications to the inlet structure, flow meter install and construction of a new operator’s office and storage building.
Latest Projects

Roading

2020 - ODC Wharepuhunga Road Rehabilitation Pavement Rehabilitation

Contract 1.2KM long including significant cut to fill earthworks, drainage improvements, pavement construction, stabilisation and first coat sealing.

2019 - RLC - Camellia Drive Seal Extension

Seal Extension and improvement including earthworks, drainage improvements, pavement construction, first coat sealing and pavement marking.

2019 - Waitomo DC - Waitomo Footpaths Replacements

Construction of 2km of footpath replacements and associated works throughout the Waitomo District.