Latest Projects

Earthworks

2018 - Dixon Heights Residential Subdivision Development Stage 1

Earthworks including 11,000M3 topsoil strip and 13,000M3 cut to fill. This was the first of multiple stages completed on this site.

2018 - Te Awamutu Wastewater Treatment Plant Pond Upgrade

Te Awamutu Earthworks including 60,000M3 cut to fill, 20,000M3 imported hard Fill, installation of a bentonite liner.

2017 - Azimuth Subdivision - Tirua Coromandel

(Sub-contractor to Fulton Hogan). Earthworks through gully with cuts up to 16m deep including 6,500M3 topsoil strip and 88,000M3 cut to fill.
Latest Projects

Earthworks with Retaining Walls

2017 - Dairy Goat Shed

Ground improvements involved 130 meters of 7 metre sheet piles as a temporary structure to hold the buildings whilst the excavations were made.
Latest Projects

Civil Site Works

2017 - Stanley/ Jack McLean Community Centre, Thames

Siteworks in tidal ground water conditions including backfill and preparation of building pad, 3-waters , timber/ concrete block retaining walls, carpark construction.

2016 - Livingstone Builders/ Bunnings North Hamilton

Siteworks for a new Bunnings warehouse including building pad, 3.8km of trenches and drainage and 13,000M2 carpark construction.

2019 - Foster Construction/ Toyota Lexus Hamilton

Construction of a new car park extension including a significant import of fill, the installation of a storm water system and pavement construction.
Latest Projects

3-Waters Infrastructure

2018 - HEP City Edge Alliance for Waikato Expressway Project

Stormwater installation as Sub-Contractor to City Edge Alliance on part of the Waikato Expressway project. Involves some 12KM+ of up to DIN 1350 deep drain laying.

2019 - WDC - Waipa Watermeter Installations

Involved upgrade and renewal of various water meter connections for both residential and commercial connections across the Waipa network. Significant stakeholder engagement.

2019 - WBOP Te Puke Stormwater Upgrade

Stormwater upgrades in Stewart Street and Queen Street included replacement of existing stormwater pipelines, catch pits and manholes and installation of 60 metres of pipe; sump leads, manholes, catch pits and concrete sumps.
Latest Projects

Process

2018 - WDC - Te Awamutu Wastewater Pond Upgrade

Bulk Storage Tank Installation, including formwork and concrete foundations for epoxy over steel storage tank installation.

2017 - Azmituth Subdivision, Tirua - Coromandel - Water Reservoir 200ML

Water reservoir construction involved submitting an alternative design for epoxy over steel design to save costs. Construction of booster pump station.
Latest Projects

Roading

2019 - Titanium Southern Precinct Hamilton Airport

Significant project including roading, intersection tie into State Highway 21 over 4000m2 of concrete prep and construction and 6000m2 of Pavement asphalt including kerb and channel.

2018 - Highland Properties - Ohaupo

The project involved construction of a main link road between two existing roads. We also constructed a 4.5m arched bridge structure and all piling and concrete form work associated with the structure.