Camex Civil - Logo
Camex Civil - Logo
Latest Projects

Earthworks

2016 - Fonterra Morrinsville

(Sub-contractor to Fulton Hogan). Earthworks including 22,000M3 cut to fill with excavations up to 5m deep in gully and importation and placement of 5,000M3 special clay fill liner.
Latest Projects

Earthworks with Retaining Walls

Latest Projects

Civil Site Works

2017 - Fletcher Construction/ Port of Tauranga

Siteworks for Shed 16 building of 21,000M2 at Port of Tauranga, including preparation of building pad, stormwater drainage and water reticulation.

2017 - Fletcher Construction/ UOW Law Centre Building

Siteworks for 6,000M2, 5-storey building at the University of Waikato Campus, including 13000m3 of cut to fill, cut to waste 10,000m3. 3- waters, concrete works and kerbing, landscaping, carpark and surfacing.
Latest Projects

3-Waters Infrastructure

2018 - Ohaupo Bridge

Involved construction of 4M diameter arch culvert. Involved ground improvements – 47 x 13m long piles, capping beams 1m x 1m reinforced concrete with tie-in to culvert structure.

2018 - WDC - Williamson Street 3-Waters

Involved three waters deep drain laying through built up residential street and public reserve. Existing services alignments were significantly different to plans and resulted in a collaborative approach to design.

2018 - Fulton Hogan/ Rangatahi Bridge Crossing

This project required the Installation of all services across a bridge crossing to the Rangitahi Peninsula. This included 8 x DN 150 ducts and a DN 450 PE water pipeline. This project required working at heights, working around other services and working with the harbour tidal flows.
Latest Projects

Process

Latest Projects

Roading

Latest Projects

Subdivisions

Request a Quote
© Copyright 2020 Camex Limited. All rights reserved.
Website by Creative Buzz.