Camex Civil - Logo
Camex Civil - Logo
Latest Projects

Earthworks

Latest Projects

Earthworks with Retaining Walls

Latest Projects

Civil Site Works

Latest Projects

3-Waters Infrastructure

2019 - Transland subdivision Swayne Road Cambridge

Involved pump station construction and commissioning, deep trenching and drain laying, water reticulation and wastewater rising mains. Drainage involved de-watering for trenching up to 4m below the ground water levels.

2016 - Fulton Hogan/ Kahikatea Drive Extension Stormwater

installation (as Sub-Contractor to Fulton Hogan) on the Kahikatea Drive extension project. Included deep excavations and manholes and stormwater pipes up to DIN 1050. All work was at night and reinstated for each morning.

2018 - WDC - Byron Street Upgrade

Involved excavating and removing an existing 306m x 300mm stormwater line and replacing it with a new 375mm stormwater line, along with replacing all manholes, catchpit leads and catchpits. Extensive stakeholder engagement.
1 3 4 5 6
Latest Projects

Process

Latest Projects

Roading

Latest Projects

Subdivisions

Request a Quote
© Copyright 2020 Camex Limited. All rights reserved.
Website by Creative Buzz.