New announcement. Learn more

TAGS

Acacia Bay Water Supply

2021-2022 - TAUPO DISTRICT COUNCIL

Involved upgrading the Nukuhau pump station and connecting Acacia Bay to the main Taupo water supply. Included a DN355 PE pipeline from Nukuhau to Acacia Bay, upgrades and renewal of rider and water mains DN63 to DN315 through to Tongariro st, air valves, hydrants and fittings. The extended scope included upgrade of the existing shared path and a bridge crossing.