New announcement. Learn more

TAGS

Stromwater Defenders Taupo

HAWAI STREET, TWO MILE BAY BOAT RAMP, TURANGA PLACE STORMWATER DEFENDERS

Stormwater upgrades involved installation of Stormwater Downstream Defenders in the larger catchment areas in the Taupo District. Two units were 2550 Ø installed in Turangi and within the Two-Mile Bay Boat ramp carpark and a third 3000 Ø unit in the Hawai Street reserve.

Our team carried out installation at depths of up to 5 meters, whilst encountering challenging conditions included running sand at the Hawai Street Reserve and the excavation at the Two-Mile Bay Boat ramp being equal to the height of the adjacent lakefront.